constraint of action times 动作次数约束
corrective action response times 纠正措施响应时间
times of load action 载荷作用次数
And accordingly the system power loss, voltage, and equipment action times can be optimized.
从而可兼顾系统有功损耗、电压质量及设备动作次数的综合优化效果。
A two-phase optimization method of multi-period reactive power and voltage control was proposed to confine the action times of control devices.
为减少无功电压控制设备的动作次数,提出了一种多时段无功电压控制的两阶段优化方法。
应用推荐